What Common Mistakes Should I Avoid for San Diego Permits?

  • Writer: Seth Gilley
    Seth Gilley
  • Oct 6
  • 9 min read

Key Highlights

Here is a quick look at the common mistakes to avoid during your San Diego building permit process:

  • Submitting incomplete permit applications can cause significant delays in the approval process.

  • Failing to follow San Diego’s unique local building codes is a frequent reason for rejection.

  • Overlooking specific zoning and setback requirements often leads to costly plan revisions.

  • Omitting critical details on your site plans will slow down the review by officials.

  • Not addressing corrections from the city promptly can extend your project timeline.

  • Understanding these common mistakes is the first step toward a smoother permit process.

What common mistakes should I avoid when preparing permit drawings for San Diego projects?

What common mistakes should I avoid when preparing permit drawings for San Diego projects?

Embarking on a construction project in San Diego is exciting, but navigating the building permit process can be challenging. The city’s requirements are known for being thorough, and simple errors can lead to frustrating delays. Understanding the common pitfalls before you start can save you time, money, and stress.


This guide will walk you through the mistakes to avoid when dealing with the San Diego Development Services Department, helping you get your project approved and underway without unnecessary setbacks.


Understanding San Diego Permit Requirements

Before you even begin drafting your plans, it’s crucial to understand San Diego’s specific permit requirements. The San Diego Development Services Department has a comprehensive set of rules that all projects must follow, and compliance is non-negotiable.


Familiarizing yourself with these local regulations is the best way to prepare successful permit applications. Knowing what reviewers look for will help you create plans that meet all standards from the start. Let’s explore the types of permits, local codes, and documentation you’ll need.


Types of Building Permits Needed in San Diego

The type of building permit you need depends entirely on the scope of your work. San Diego requires a construction permit for almost any project involving new construction, structural changes, or alterations to a building's use. This applies to both residential projects and commercial ventures.


Whether you're planning a small home remodel or a large commercial building, a permit is necessary; the city has specific categories. It’s important to apply for the correct one to avoid immediate rejection.


Common projects that require a building permit include:

  • Accessory Dwelling Units (ADUs), including garage conversions

  • Whole-house remodeling, such as kitchen and bathroom renovations

  • Home and room additions

  • Commercial tenant improvements

  • New construction projects


Local Codes and Regulations to Consider

The City of San Diego is known for its stringent local building codes, which are in place to ensure safety and quality. These regulations often go beyond general state requirements due to the region's unique environmental factors, such as seismic activity and coastal conditions. Achieving code compliance is a crucial step in the permit process.


Your project plans must demonstrate adherence to all applicable local regulations. This includes everything from structural integrity and energy efficiency to zoning ordinances that can vary by neighborhood. San Diego’s building codes are thorough, so careful attention to detail is essential.


For instance, projects may need to meet specific historical review standards if the property is over 45 years old or comply with stormwater management plans. Overlooking any of these local building codes can bring your project to a halt.


Key Documentation for Permit Applications

Your permit applications must be submitted with a complete package of required documents. Missing paperwork is one of the most common reasons for immediate delays in the review process. Your project plans should be clear, detailed, and prepared by licensed professionals.


In addition to design plans and structural calculations, the city requires several specific forms. The exact documents depend on your project, but preparing them correctly is crucial. Professional permit services can help ensure you have everything you need before submission.


Here is a table of some common forms you may need to complete for your San Diego permit application:

Form Number

Form Name

DS-345

Project Contacts Information

DS-560

Storm Water Requirements Applicability Checklist

DS-16

Water Meter Data Card

DS-165

Hazardous Materials Reporting Form

DS-164

High-Piled Combustible Storage Forms

Common Mistakes in Preparing Permit Drawings

The quality of your permit drawings can make or break your application. The building department reviews these plans meticulously, and common mistakes can lead to rejection or lengthy correction cycles. Accurate and complete building construction plans are your best tool for a smooth building permit process.


Errors in your drawings not only cause delays but can also result in unexpected costs for revisions. Being aware of these pitfalls ahead of time helps you prepare a stronger submission. Below, we’ll cover some of the most frequent errors found in permit drawings.


Omitting Required Details on Site Plans

One of the most significant yet avoidable mistakes is submitting site plans with missing information. A site plan serves as the roadmap for your project, and every detail matters to the plan reviewer. Incomplete building plans will almost certainly slow down your permit approval.


Your site plans must clearly show all relevant features of your property. This includes existing structures, proposed changes, and critical measurements. Ambiguity or missing data forces reviewers to send your plans back with correction notices, delaying your project timeline.


Ensure your required documents include site plans with these key details:

  • Accurate property lines

  • Setbacks from all boundaries

  • Location of existing and proposed structures

  • Details on drainage and topography


Using Incorrect Scaling or Notation

Precision is essential when it comes to permit drawings. Using incorrect scaling or unclear notations can make your plans difficult or impossible for officials to review. San Diego has specific requirements for how building construction plans should be formatted, and following these guidelines is mandatory.


Your drawings must be created to a clear and verifiable scale, with all dimensions and notes legible. When reviewers cannot understand your plans, they cannot approve them. This mistake often leads to an immediate request for revisions, which extends the review process.


To avoid this, ensure your permit drawings are professional and adhere to all building codes and city templates. Using advanced CAD technology can help create precise, code-compliant plans that meet the technical requirements for submission, ensuring a smoother review process.


Overlooking Zoning and Setback Guidelines

Understanding zoning and setback guidelines is crucial for a successful permit application. Many applicants fail to consider the specific local regulations set by the City of San Diego, which can lead to costly delays in the approval process.


Proper research ensures that projects comply with property lines and land use regulations. Incorporating these elements into your site plans not only prevents potential setbacks but also guarantees safety standards are met, providing peace of mind as you navigate your construction projects.


Avoiding Delays During the Approval Process

Once your application is submitted to the Development Services Department, the goal is to move through the approval process as quickly as possible. However, several common pitfalls can cause unnecessary delays and extend your project timeline by weeks or even months.


Avoiding these permit delays often comes down to preparation and proactive communication. By ensuring your submission is complete and responding quickly to feedback, you can keep your project moving forward. Let’s look at how to prevent common hold-ups.


Submitting Incomplete Permit Packages

A complete permit package is the foundation of a smooth approval process. Applying with missing documents or incomplete information is a guaranteed way to cause project delays. The review process cannot begin until the city has everything it needs.


Before you submit, double-check that you have included all required plans, forms, calculations, and supporting documentation. Even a single missing signature can get your application rejected, forcing you to restart the submission process. Using professional permit services can help ensure your package is 100% complete.


An incomplete submission can lead to delays in the approval process. Make sure your permit packages include:

  • All required city forms, fully completed

  • Professionally drafted, code-compliant plans

  • Structural calculations and reports

  • Receipts for any applicable fees


Failing to Address Corrections Promptly

It is common for the city to request corrections during the plan review process. How you handle these requests is critical to keeping your project on track. Failing to address corrections promptly or completely will significantly slow down your permit approval.


When reviewers identify issues, they will provide comments outlining what needs to be fixed. It’s important to resolve every comment thoroughly, as partial fixes often lead to repeated submissions and further delays. This is a standard part of the review process designed to ensure full compliance.


Working with permit expediters or seeking professional guidance can help you manage corrections efficiently. They can coordinate with your design team to address feedback quickly, reducing the back-and-forth that typically stalls the permit process and getting you closer to final approval.


Missing Pre-Application Consultations

One of the most effective ways to avoid common pitfalls is to engage in a pre-application consultation. The Development Services Department offers opportunities to discuss your project with staff before you formally submit your plans. Missing this step means you lose a valuable chance to identify potential issues early on.


During a pre-application meeting, you can get feedback on your concept, clarify code requirements, and understand what reviewers will be looking for. This insight allows you to refine your plans and prepare a much stronger application, positioning it for a smoother review.


Thorough research combined with a pre-submission review can prevent costly and time-consuming mistakes. Project managers and scout services often use these consultations to identify challenges before they become expensive delays, making it a wise investment for any complex project.


Critical Elements Officials Look For in Drawings

When the building department reviews your drawings, they are looking for specific elements to ensure your project is safe, legal, and compliant. Understanding their priorities can help you create plans that meet their expectations and pass review without major issues.


Officials focus on code compliance, safety standards, and adherence to all permit requirements. Your drawings must clearly demonstrate that your project checks all these boxes. Here are a few of the most critical elements that reviewers scrutinize.


Compliance with Local Building Standards

Above all, San Diego officials are looking for strict code compliance with local building standards. Your drawings are the primary evidence that your project design meets all regulatory requirements. This includes San Diego’s specific rules for seismic safety, energy efficiency under Title 24, and coastal zone regulations.


Reviewers will meticulously check your plans against these local building codes. Any deviation or ambiguity can lead to rejection. Ensuring your plans are designed with these standards in mind from the very beginning is essential for a successful building permit process.


Demonstrating full compliance is not just about following rules; it’s about proving your project meets all safety standards. Clear, accurate, and compliant drawings show reviewers that you have done your due diligence, which helps build confidence and streamline the approval.


Inclusion of Accessibility Features

For commercial properties and certain residential projects, the inclusion of accessibility features is a non-negotiable requirement. Officials will carefully check your plans to ensure compliance with local regulations and federal laws like the Americans with Disabilities Act (ADA).


Failing to properly incorporate these features is a common reason for plan rejection. Your drawings must detail how the building will be accessible to people with disabilities, from parking lots to restrooms. Achieving code compliance in this area is critical for obtaining a building permit.


Key accessibility features reviewers will look for include:

  • ADA-compliant handicap parking and pathways

  • Accessible entrances, doorways, and ramps

  • Properly designed restrooms with required clearances

  • Accessible routes throughout the building


Evidence of Code-Compliant Structural Design

A building's structural integrity is a top priority for the building department. Your building construction plans must provide clear and convincing evidence of a code-compliant structural design. This is especially important in San Diego, given the region's seismic activity.


Your submission must include detailed structural calculations and drawings prepared by a licensed professional. These documents demonstrate that your building can withstand environmental stresses and is safe for occupancy. Officials will not approve plans without this proof of code compliance.


Reviewers will look for proper load calculations, foundation details, and framing plans that all adhere to current building codes. Any shortcuts or missing information in the structural design portion of your plans will be a major red flag and cause for rejection.


Conclusion

Navigating the permit process in San Diego can be challenging, but avoiding common mistakes can make all the difference in your project's success. By understanding the requirements and being meticulous with your documentation, you can save time and reduce frustration. Remember to pay attention to the details on your site plans, follow the local codes, and submit thorough applications to prevent delays. The more prepared you are, the smoother the approval process will be.


If you have any questions or need assistance, don’t hesitate to get in touch! Your successful project starts with the right guidance.





Common mistakes to avoid when preparing permit drawings for San Diego projects: FAQ


Do permit drawings for San Diego need special information?

Yes, permit drawings for San Diego must include information specific to local regulations. This includes details on seismic compliance, Title 24 energy standards, coastal zone rules, and zoning requirements. These details are crucial for passing the city’s thorough review process for a building permit.


What are typical reasons for rejection of San Diego building plans?

Typical reasons for the rejection of San Diego building plans include incomplete permit applications, lack of code compliance with local building codes, and missing details on zoning or accessibility. Any failure to demonstrate that your project meets the city’s safety and legal standards can lead to rejection.


How detailed should my drawings and documents be for fast San Diego approval?

For fast San Diego permit approval, your permit drawings and documents must be extremely detailed. They should clearly demonstrate how your construction project complies with all city requirements, including structural calculations, site plans, and floor plans. The more complete and accurate your submission, the smoother the process.


How can I avoid delays in San Diego permit approval due to errors in my drawings?

You can avoid permit delays by ensuring your drawings are complete and accurate before submission. Consider a pre-application consultation, address all correction requests promptly, and work with experienced project managers or permit expediters who understand the San Diego building permit process for both residential and commercial building permit projects.

 
 
 